Parsellen consists of 14.3 kilometers of dual-track railway, designed for speeds of up to 250 kilometers per hour. 12.3 km of parsellen is the tunnel. Poweron AS has assisted with 3D construction / engineering of mast arrangement, delivery of load disconnectors, motor controllers, material for AT, transitions line hanger cable, AT traverser w / clamp.
KundeBane NOR SF, NorgeÅr2015-2016