From Farriside to Porsgrunn, 22.5 km of double-track railway is built, divided into seven tunnels and ten bridges. Poweron AS has assisted with 3D construction / engineering of mast arrangement, delivery of load disconnectors, engine controllers, AT equipment, transitions line hanger cable, AT traverser m / clamps and striving solution for KL in tunnel.
KundeBane NOR SF, NorgeÅr2016-2017